everything.study
BCN 4612C

Construction Estimating 2

3 Credits

Analysis and determination of cost of construction operations including applicable indirect and overhead costs and the preparation of bid proposals for commercial construction projects. A cost-control system is introduced and implemented with sample field-generated problems.

Prerequisites & course information

Grading Scheme: Letter Grade Prerequisite: BCN 3611C and senior standing.

Sources